Construction Scheduler
: Job Details :


Construction Scheduler

Integrated Water Services

Location: all cities,TX, USA

Date: 2024-11-10T08:32:24Z

Job Description:
Job Type Full-timeDescriptionAt Integrated Water Services (IWS) we make water better! IWS is a fast-growing provider of integrated solutions for water and wastewater treatment, with a special focus on water recycle and reuse. IWS has been a leader in providing the most technologically advanced treatment systems in a turn-key fashion for more than 20 years. Our clients in the municipal, residential and industrial markets choose to do business with IWS for the unparalleled service and speed that make our projects headache-free. We're seeking an experienced construction scheduler who will be integral to the success of our water and wastewater treatment projects by owning the scheduling function for our growing company. If you're well versed in Critical Path Method schedule development, thrive in a fast paced and dynamic environment and have passion for making a difference, apply now!Responsibilities:
  • Perform Critical Path Method (CPM) schedule development, schedule analysis, and prepare schedule presentations using Primavera P6.
  • Develop, monitor, and update resource-loaded schedules.
  • Evaluate, perform resource analysis, perform critical path analysis, and prepare reports.
  • Develop standards/guidelines for pre-award, pre-construction and active project schedules in conjunction with Project Management.
  • Develop project/construction baseline CPM schedules in accordance with developed guidelines for approval by project teams.
  • Provide support, scheduling assistance and education to project team members.
  • Develop schedule templates for various types of projects.
  • Update project schedules with the project managers to include any scope changes on a weekly or as needed basis.
  • Assist in development and monitor and update any required integrations with the ERP or other financial tools for forecasting, budgeting and cost analysis.
  • Submit and present schedules and progress reports at project meetings.
  • Develop and maintain an effective quality control program to ensure services are performed in accordance with established standards.
  • Develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
Requirements
  • Bachelor's degree in Engineering, Construction Management or related field from an accredited institution preferred, or equivalent years of experience.
  • Minimum of 5 years of experience developing resource loaded CPM project schedules in P6 (Primavera).
  • Intermediate to advanced skills in Primavera P6.
  • Intermediate to advanced competency in schedule and cost control (preferred but not required).
  • Proven experience running reports in Primavera.
  • Intermediate level of proficiency with MS Office Suite.
Location: Hybrid. Preferred location: Houston, TX; San Antonio, TX or Austin, TX. A fully remote work arrangement may be considered for the right candidate. 15-20 % travel will be required. Total Rewards Package includes:
  • Competitive salary and benefits including:
    • Medical, Dental, Vision, STD, LTD
    • PTO
    • 401k
  • An opportunity to grow your skills and your career
Base Salary: $90k-120k annually* *The provided base salary range is used nationally. The rate offered is compliant with federal/local regulations and may vary by experience, certification/education, market conditions, location, etc. We work to solve our customers' water problems. We design and build the most efficient and effective plants utilizing our own best in class technologies. And we do it all with great people like you! There is nothing better than knowing that what you do creates a better future. Come join us as we make water better, one drop at a time!IWS is an equal opportunity employer, we do not discriminate based on marital status, race, color, creed, gender, sex, religion, national origin, gender identity, age, veteran status, union affiliation, physical or mental disability, citizenship status, or sexual orientation. Salary Description $90k-120k per year
Apply Now!

Similar Jobs (0)