About Us: BW Design Group is a fully integrated architecture, engineering, construction, system integration, and consulting firm committed to helping our clients realize their most critical goals from Strategy to Commercialization. As the...
The NYC Department of Design and Construction, Division of Safety & Site Support, seeks a Senior Project Manager (Environmental). Under direction of the Section Chief, with wide latitude for the exercise of independent judgement and initiative,...
Our client is a rapidly growing organization known for its ability to provide highly engineered technology, service and system solutions to a range of aerospace and associated markets. They have an exciting newly created position for a Sr.
Summary This is an open continuous announcement. Applications will be accepted on an ongoing basis and qualified candidates will be referred to the hiring manager on a weekly basis until position is filled. Responsibilities The incumbent serves as...
Position: Construction Estimator Client: Leading General Contractor / Developer in Westchester Compensation: $150,000 - $200,000 Location: Westchester, NY...
This job is with Synechron, an inclusive employer and a member of myGwork – the largest global platform for the LGBTQ business community. Please do not contact the recruiter directly. We are At Synechron, we believe in the power of digital to...
Inspects vacant unimproved parcels with unimproved ad joiners to prepare a Survey Memo in order to eliminate the cost of a boundary survey. Adjudicates boundary line disputes whenever possible. Verifies boundary lines when in question of...
Summary This is an open continuous announcement. Applications will be accepted on an ongoing basis and qualified candidates will be referred to the hiring manager on a weekly basis until position is filled. Learn more about this...
Position: Project Manager Position Description: DBI Projects is seeking to bring on a Project Manager capable of managing capital projects across all stages. DBI values an...
At Atlantic Testing Laboratories (ATL), we offer a dynamic career that blends fieldwork with office assignments. With 55 years of experience, ATL is a full-service engineering support firm operating from 11 offices throughout New York State. Our...